A charger that isn’t commissioned isn’t serving drivers or earning revenue. On most commercial deployments, the gap between install day and go-live often comes down to one step: commissioning. 

Schneider Charge Pro, the commercial Level 2 charger from Schneider Electric and EV Connect, was designed to close that gap. On an early installation, Brad Pace of TCA Electric, a North Vancouver, British Columbia contractor that has installed hundreds of chargers for businesses and multifamily properties, said his technician commissioned the unit in less than 30 seconds. 

The Hidden Cost of Commissioning Delays 

Pace said commissioning with other providers can sometimes drag out. His team has to schedule a time for someone on the provider’s end to verify the chargers, then get a technician onsite to match. If anything goes wrong, they do it again. 

Every extra visit costs time for the technician onsite and the people managing the schedule, and it pushes back the day a charger starts serving drivers. For site hosts and the partners who sell to them, that is lost go-live time. 

Commissioned in Under 30 Seconds on TCA Electric’s Install 

 Most commissioning delays happen where the hardware and software providers have to coordinate. Charge Pro removes that step because the charger and EV Connect’s software were built to work together. The charger ships from the factory with its SIM card installed and ready to connect. Your installer brings it online in EV Connect’s self-service web tool, with no support call or scheduled verification needed. 

Pace wasn’t onsite for the commissioning, but he said the technician who handled it finished so quickly that he thought he’d made an error. 

“The commissioning process was bar none the easiest process we’ve ever done. We’ve commissioned many other EV chargers from other third-party companies, and the process is a headache. With Charge Pro, we had it all done in less than 30 seconds, which is something we’ve never experienced before.” 

-Brad Pace, TCA Electric

Commissioning time can vary by site, cellular coverage and installation conditions. 

What Faster Commissioning Means for Your Business 

For site hosts, chargers that go live sooner can start earning sooner. Pace said commercial chargers can be revenue generating, and in British Columbia they can tie into incentive programs. His utility, BC Hydro, offers “a lot of programs” and “a lot of rebates, especially when it comes to EV charging.” Incentives vary by region and utility, so ask your installer what applies at your site. 

For resellers and white label partners, the installer experience shapes the customer experience. A charger that’s simple to commission can mean fewer stalled closeouts and installers who are glad to take on the next job. Pace said he doesn’t understand why the old process became the standard. 

Built for Commercial Sites 

Pace’s team shared what stood out about the hardware. 

  • J1772 and NACS connector options: Most multifamily residents want a J1772 connector, Pace said, but some drivers need NACS (North American Charging Standard). He called having both options available from the start “a very good idea.” On a past order from another company, a couple of NACS units were backordered, which delayed closeout by a week. 
  • Connectivity for remote sites: Charge Pro’s SIM card can be swapped in the field, so an installer can change carriers onsite. Pace called that ability “critical in rural areas.” His team once installed chargers just off a ski resort in Whistler where the SIM had little to no service. 
  • Built-in electrical limits: An installer-only derating dial lets your installer set a hard limit on each charger to match your site’s electrical service. Pace called having that limit set on the charger itself “critical.” 
  • Field-replaceable cord: If a driver damages a cord, a licensed contractor can replace it onsite. Pace said his team has replaced cord ends only five or six times across hundreds of installs, and that the swap is “very straightforward.” 

Pace’s overall verdict on the hardware: “We feel it’s very well made.” 

Plan Your Capacity Before You Install 

Pace’s first piece of advice for any business adding EV charging: know how much room your electrical service really has. A panel full of breakers doesn’t always mean you’re out of capacity. Usage data from your utility shows what’s available, and that determines how many chargers your site can support. 

Multifamily sites will often need load management too, which lets many chargers share limited capacity. Pace said the key for contractors is knowing how to configure it, so plan it with your installer from the start. 

About EV Connect 

EV Connect is a full-service EV charging partner, offering end-to-end support from incentive guidance and site assessment to Level 2 commercial EV charging stations, DC fast charging stations, charging station installation, EV charging software and 24/7 customer support. Everything is designed to simplify deployment and ensure long-term reliability and performance. 

16+ years of charging expertise bring it all together, backed by Schneider Electric, the world’s most sustainable company.* 

Request a Quote or Contact Us Today to see what Schneider Charge Pro can do for your sites, and find out why CPOs, OEMs, utilities and more trust EV Connect to run their businesses. 

*Schneider Electric was named “World’s Most Sustainable Company 2026” by TIME Magazine and Statista, and “World’s Most Sustainable Corporation 2025” by Corporate Knights.